September Meeting moved to Monday the 8th! Be sure to read the Forum Rules before posting
4-6-08 - Ray, Aaron M and myself spent 4 hours each at SBP to clear some deadfall and check trail conditions
4 x 3 = 12 Hours
Total for 2008: 12 hours
4/27/2008 1 hour work, 1 hour cover trails... I covered all trails. 3 trees down on LT, one on Farmdale at the bridge. Wet spots on kickapoo entry/exit, LT, and Blue Mound. The wet spots are all about 4-8ft in lenth, the rest of the trail is solid. Removed limbs and other deadfall, saws needed for the rest.
Forgot to post up my times.
4/19- 4 hours trenching and tubing one wet area, trenching another.
4/21- 2.5 hours tubing second wet area. these are gonna take a while to dry out, but once they do it should be decent like the green route around the watermelon.
Also, I know of 2 occasions where we went out to cut trees in JJanuary and february, 3 hour and 4/6 people. 3x4=12, 3x6=18
TOTAL: 52.5
A HUGE THANK YOU TO EVERYONE WHO SHOWED UP TO MAKE YET ANOTHER SUCESSFUL FORC TRAIL DAY!!
The SBP trails are squeaky clean thanks to all who raked and cut weeds, 99.9% of the wet areas have been repaired thanks to Ray Ray and his crew, and WE HAVE A NEW LOOP TO RIDE!!!
That is a total of 75 volunteer hours in one day!
Total: 127.5
5-9-08 1 hour 5-11-08 1.5 hours
mark
Total: 130
Thank you everyone for all your hard work.
This club ROCKS!!!!!!!
Need I say more?
Poofygirl
Rg. cutting weeds, 3.5hr
Total 133.5
6/5/08 mp, db 2 hrs x 2 = 4 6/6/08 mp, db 3 hrs x 2 = 6 =10 we completed weed wacking all of LT and Gangrene. As of friday eve LT was still very soft. Total = 143.5 hrs
6/11/08 2 hrs of weed wacking on Farmdale.
Total = 145.5 hrs
06/18/08
2 hrs. weed wacking on Palos.
Total = 147.5 hrs.