Results 1 to 4 of 4

Thread: 2013 Trail Work/Maintenence Log

  1. #1
    Join Date
    Mar 2012
    Location
    East Moline, IL
    Posts
    87

    Default 2013 Trail Work/Maintenence Log

    2 hrs clearing fallen trees, Drew, JB, Russ, Sergio, Corbin helped too after his run
    [ATTACH]forctrees2..jpg[/ATTACH]
    Attached Images Attached Images

  2. #2
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,876

    Default 2013 Trail Work/Maintenence Log

    This is the place to post your volunteer hours for 2013 at Illiniwek. If you took some photos feel free to post them as well.

  3. #3
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,876

    Default

    4/27/13: Sergio, Drew - 5 hrs - Trail repair and rehab.

    5/15/13: Paul, Drew - 3 hrs - Trail rehab.

    5/16/13: Sergio, Drew - 4 hrs - Trail rehab, improved climbing turn near stream.

    5/19/13: John, Deb, Brian, Dan, Paul C., Vonda, Mike C., Drew - 17 hrs - Trail rehab, trimming trail corridor.

    5/23/13: John, Drew - 1.5 hrs - Clearing deadfall, trimming trail corridor.

    5/31/13: Russ, Sergio, Drew - 7.5 hrs - trimming trail corridor.

    6/1/13: Vonda, Drew - 3.5 hrs - Trimming trail corridor.

    6/6/13: Sergio, Drew - 6 hrs - Trimming trail corridor, drainage improvements.

    6/16/13: Drew - 3.5 hrs - Trimming trail corridor.

    6/17/13: - John, Drew - 4.5 hrs - Trimming trail corridor, drainage improvements.

    6/20/13: Sergio, Drew - 5 hrs - Installed berm on off camber corner behind salt dome.

    6/27/13: John, Russ, Sergio, Mike C., Drew - 12 hrs - Clearing fallen trees from storms.


    Total: 72.5 hrs

  4. #4
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,876

    Default

    6/30/13: John, Deb, Mike C., Paul C., Dave D., Russ, Drew (20.5 hrs)
    North Loop - Rehab of sections of rerouted trail

    7/16/13: Sergio, Drew (3 hrs)
    South Loop - Clearing deadfall

    7/25/13: Sergio, Drew (3.5 hrs)
    South Loop - Trail repair from blown down tree.

    8/26/13: Sergio, Mike C., Russ, John B., Drew (7.5 hrs)
    South Loop (behind salt dome) - Removing glass filled soil and infilling trail bed with clean dirt.

    8/28/13: Sergio, Mike C., Darien, Drew (8 hrs)
    South Loop (behind salt dome) - Removing glass filled soil and infilling trail bed with clean dirt.

    9/13/13: Snauffer, Drew (2 hrs)
    North Loop - Clearing deadfall

    9/18/13: Sergio, Rick, Drew (3 hrs)
    South Loop - Adding berms on off camber corners

    9/19/13: Sergio, Drew (3 hrs)
    South Loop - Adding berms on off camber corners

    11/7/13: Sergio, Mike C. Steve B., Drew (6 hrs)
    North Loop (creekside trail)- Armoring

    11/7/13: Sergio, Mike C. Steve B., Russ, Daniel O., Brian K., Drew (9 hrs)
    North Loop (creekside trail) - Armoring

    11/9/13: Russ, Mike C., Drew (5.5 hrs)
    North Loop (river facing bluff S-berm area)- Armoring

    11/10/13: Russ, Mike C., Sergio, Steve ?., Mike V., Cayson, John B., Deb, Vonda, Becky B., Josh, Shane, Drew (39 hrs)
    North Loop - Reroute around low area, Log overs, armoring

    Total: 182.5 hrs

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •