Results 1 to 10 of 10

Thread: 2024 Illiniwek Trimming Status

  1. #1
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,863

    Default 2024 Illiniwek Trimming Status

    The vegetation got a head start this year and is already starting to droop into the trails.

    If you have a couple hours to help, pick a section, or more than one ;), on the map below and go to town trimming back vegetation that is encroaching on the trails. We usually trim at least 2 feet to each side of the trail. Leave any trees within this zone obviously. FORC has a handful of trimmers we can loan you. Post below if you need one and we can make arrangements. Once a section is completed, let us know so we can update this thread.

    Recommended gear for trimming: Long pants/shirt, sturdy shoes, eye protection, bug head net, bug repellent, water/snack.


    Section | Status
    1 - South Down & Connector | Trimmed
    2 - South Up | Trimmed
    3 - Upper South West | Trimmed
    4 - Upper South East | Trimmed
    5 - Connector & North Climb | Trimmed
    6 - Overlook Loop | Trimmed
    7 - Trimmed
    8 - North Down | Trimmed
    Last edited by DH001; 06-19-2024 at 12:46 PM.
    ⚒ Trails don't build themselves. ⚒

  2. #2

    Default

    I am able to help out on Thursday (5/30). I will need a trimmer though. I can meet you there at approx. 5pm if you are able to supply the trimmer. I can start with the South Up. Let me know. Thanks. -Ty

  3. #3
    Join Date
    Feb 2008
    Location
    Hampton, IL
    Posts
    435

    Default

    The field section of #3 is done along with most of #4 I'll finish it this weekend.
    "I've spent half of my life riding a bike, the other half I wasted!"

  4. #4
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,863

    Default

    Quote Originally Posted by millert View Post
    I am able to help out on Thursday (5/30). I will need a trimmer though. I can meet you there at approx. 5pm if you are able to supply the trimmer. I can start with the South Up. Let me know. Thanks. -Ty
    I'll meet you there a little after 5pm with a trimmer. Thanks!

    Also working on getting a walk behind string trimmer for the field and less sloped trail sections. May have it by next week.
    ⚒ Trails don't build themselves. ⚒

  5. #5

    Default

    Quote Originally Posted by DH001 View Post
    I'll meet you there a little after 5pm with a trimmer. Thanks!

    Also working on getting a walk behind string trimmer for the field and less sloped trail sections. May have it by next week.
    10-4

    Sent from my SM-G973U using Tapatalk

  6. #6
    Join Date
    Feb 2008
    Location
    Hampton, IL
    Posts
    435

    Default

    #1 from 3 to 6 is done along with #4.
    "I've spent half of my life riding a bike, the other half I wasted!"

  7. #7
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,863

    Default

    Great, thanks! Looks like just the North side left. Sections #6 & #8 usually get the most growth on that side.
    ⚒ Trails don't build themselves. ⚒

  8. #8
    Join Date
    Jun 2009
    Location
    Hampton, IL
    Posts
    1

    Default

    Josh and I can do 6 and 8. Would you be around tomorrow morning that we could pick up a trimmer?

  9. #9
    Join Date
    Feb 2008
    Location
    Hampton, IL
    Posts
    435

    Default

    Also #3 on the south side needs to be done from 4 to the field.
    "I've spent half of my life riding a bike, the other half I wasted!"

  10. #10
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,863

    Default

    Getting close to fully trimmed. Thanks to all who have helped thus far! The sections that haven't been trimmed yet aren't terribly overgrown, but we'll want to get them soon.
    ⚒ Trails don't build themselves. ⚒

Similar Threads

  1. 2024 Trimming Status (Race Prep)
    By AndyJ in forum Sunderbruch Park [SBP]
    Replies: 4
    Last Post: 06-12-2024, 12:33 PM
  2. 2023 Sunderbruch Trimming Status
    By AndyJ in forum Sunderbruch Park [SBP]
    Replies: 3
    Last Post: 07-14-2023, 09:39 AM
  3. 2023 IFP Trail Trimming Status
    By DH001 in forum Illiniwek Forest Preserve [IFP]
    Replies: 2
    Last Post: 06-08-2023, 04:05 PM
  4. 2023 DFP Trail Trimming Status
    By DH001 in forum Dorrance Forest Preserve [DFP]
    Replies: 1
    Last Post: 06-01-2023, 07:21 AM
  5. Illiniwek/Dorrance Trail status today
    By Aaron in forum Let's Ride!
    Replies: 1
    Last Post: 06-28-2020, 02:12 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •