Results 1 to 9 of 9

Thread: 2024 Trimming Status

  1. #1
    Join Date
    Mar 2009
    Location
    Diggin'
    Posts
    171

    Default 2024 Trimming Status

    It is that time of year again when the weeds start creeping in on our trails. We will be ramping up effort to get the trails trimmed in anticipation of the FORC Side Thrill Ride on June 2. This is always a major undertaking we could use the help of everyone. We will be posting some group work days but this can be done at any time. If you would like to claim a section to trim please post up or reach to here or on Facebook. We are planning to offer volunteers some type incentive similar to what was done last year but we have yet to secure a sponsor. The club has a number of trimmers, fuel and PPE that can be provided to anyone that would like to volunteer.



    Trail Trimming Status as of 8/10/24
    Black: Could use some work but not terrible
    Red: Overgrown and needs some attention
    Green: Recently Cleared


    1 - Kickapoo Up/Down |
    2 - Comlara West |
    3 - No More Kings |
    4 - LT Section I |
    5 - LT Section II |
    6 - LT Section III |
    7 - Farmdale I |
    8 - Jubilee I |
    9 - Jubilee II |
    10 - Farmdale II |
    11 - Sugarbottom |
    12 - Rock Cut |
    13 - Palos/Farmdale III |
    14 - Kettle Morraine |
    15 - Jump Line /Comlara East |
    16 - Blue Mound |
    Attached Images Attached Images
    Last edited by AndyJ; 08-24-2024 at 04:22 PM.

  2. #2
    Join Date
    Mar 2009
    Location
    Diggin'
    Posts
    171

    Default

    Big thanks to those that have come out trim. We have knocked out a number of sections. Trail status above has been updated to reflect trails that are complete and those that still need attention. If you can make it out to trim a section please post up.

  3. #3
    Join Date
    Mar 2009
    Location
    Diggin'
    Posts
    171

    Default

    FORC will be hosting a trail work day to finish trimming the trails in preparation for the race this Sunday (and to keep the trails clear and enjoyable for everyone). We will be meeting in the parking lot at 4:30 and will head up to work around 4:45. The club will have a handful of trimmers and PPE on hand. We could use all of the help we can get. Please post up if you can make it so we can plan resources accordingly. If you can't make the event but want to lend a hand trimming can be done anytime. See the link below for up to date trimming status.

    https://www.qcforc.org/showthread.ph...us-(Race-Prep)


    Things to bring:
    -Long pants/shirt
    -Gloves
    -Sturdy shoes
    -Safety glasses (we will have some on hand)
    -Bug spray
    -Trimmer (if you have one)

  4. #4
    Join Date
    Mar 2009
    Location
    Diggin'
    Posts
    171

    Default

    Thanks to everyone that has come out to trim. Blue mound is the only problem area remaining and I think I heard someone out there trimming as we left tonight. If it was you please post up.

  5. #5
    Join Date
    Mar 2009
    Location
    Diggin'
    Posts
    171

    Default

    Blue Mound has now be cleared. Trails are riding nice. Thanks to everyone that has been out to help.

  6. #6
    Join Date
    Mar 2009
    Location
    Diggin'
    Posts
    171

    Default

    With plenty of rain and warm temps the weeds are creeping back in. The map above has been updated with areas needing attention. If anyone wants to go out and clear some of these problems spots (or any others) we'd appreciate it. The club has trimmers that can be used, PM me if you need one. Will probably organize some trimming sessions in the next week or two (hopefully temps drop a bit).

  7. #7
    Join Date
    Mar 2009
    Location
    Diggin'
    Posts
    171

    Default

    We've been out taking care of some of the problem spots. Thanks Brad Patrick and Add who got NMK, Palos and Kickapoo Down. There are still some overgrown areas if anyone wants to go out. I have updated the trimming status at the top of this thread.

  8. #8
    Join Date
    Mar 2009
    Location
    Diggin'
    Posts
    171

    Default

    Joe got Blue Mound last night and I got Watermelon and Kettle this morning. Still a few sections that could use some work but most of the really bad areas are now clear.

  9. #9
    Join Date
    Mar 2009
    Location
    Diggin'
    Posts
    171

    Default

    Bryant was out and got Comlara East and a large portion of section 14 as well. There is a short sort section at the end of the jumpline that could use a bit of a trim but other than that trails are running good. Thanks to all of those that have been out to help.

Similar Threads

  1. 2023 Sunderbruch Trimming Status
    By AndyJ in forum Sunderbruch Park [SBP]
    Replies: 3
    Last Post: 07-14-2023, 10:39 AM
  2. 2023 IFP Trail Trimming Status
    By DH001 in forum Illiniwek Forest Preserve [IFP]
    Replies: 2
    Last Post: 06-08-2023, 05:05 PM
  3. 2023 DFP Trail Trimming Status
    By DH001 in forum Dorrance Forest Preserve [DFP]
    Replies: 1
    Last Post: 06-01-2023, 08:21 AM
  4. SIS Cleanup and Race Prep
    By MissMandy in forum Open Forum
    Replies: 1
    Last Post: 03-28-2021, 10:06 AM
  5. Race Prep
    By forcmeister in forum Racing
    Replies: 5
    Last Post: 04-06-2011, 01:59 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •